Free in-home consultation during January 2026
Free in-home consultation during January 2026
Methodology (public building permit records obtained through a FOIL)
Cost figures shown below are taken from residential permit records filed in Central Westchester County during the second half (July through December) of 2025 and include all labor/ materials/ fixtures.
Descriptions are the actual words used on the permit application
1. Existing hall bathroom to be remodeled..........................................................................................$28,000
2. Bathroom renovation - new wall and floor tiles.............................................................................$19,500
3. Construct a new bath at exist basement area.................................................................................$13,400
4. Acrylic shower base in place of tub, acrylic wall liner over existing tiles................................$14,970
5. Remodeling two bathrooms, all fixtures will remain at the same location,
change all the baseboard, re-finish floors and paint (rental apt.)..............................................$8,500
6. Complete bathroom renovation, existing tub to become single vanity..............................$28,000
7. Primary bathroom on second floor to be renovated, all fixtures and finishes
replaced but kept in same locations.....................................................................................................$19,350
8. Acrylic shower base in place of tub.......................................................................................................$16,945
9. Acrylic shower base in place of tub, acrylic wall liner over existing tiles...................................$15,195
10. Renovation of existing bathroom to make it more accessible, including new fixtures,
curbless shower, grab bars............................................................................................................................$19,500
11. Apt 1A: Replacing tile in shower and half wall, replacing shower and bathroom floor, replacing
toilet, sink, and medicine cabinet........................................................................................................$13,000
12. Remodel two bathrooms.......................................................................................................................$25,540
13. Apt 4C: Remodel bathroom...................................................................................................................$9,000
14. Remove exist.bath fixtures - install new tub, toilet, double vanity sink.................................$11,500
15. Apt 1B: Bathroom cabinet, toilet replace & new shower floor installed.................................$14,680
16. Replacement in kind of sanitation showers (Dept. of public works)....................................$49,000
17. Master bath renovation - all fixtures in same location.................................................................$19,500
18. Remove and replace granite wall tile and floor, remove and replace fan
lights, remove and replace sink and toilet...........................................................................................$8,700
19. Apt 4L: Demolition & removal of existing tiles & sheetrock within tub area up to ceiling,
installation of new wonderboard, waterproofing & tiles within shower area.........................$5,500
20. Interior alterations to the 1st floor master bedroom & bedroom #3 to add full
bathroom for the master bedroom suite......................................................................................$35,000